Scope
- Overall Project Regulatory Management and Execution for First Oil approval.
- Flag and Class rules and regulations.
- Development of Regulatory Execution Plan and checklists.
- Communication with Local Authorities.
- In-depth Regulatory Condition Assessment for compliance with Brazilian regulations, including proposal and execution of remedial actions.
- Revision of the Conversion scope of work.
- Mobilization of regulatory engineers for site execution coordination and punch list item close-out.
- Safety Studies review.
- Engineering design review.
- Regulatory Watch for continuous monitoring of changes and modifications in applicable rules and regulations.
- Development of Helideck layout drawings and pre-inspections.
- Development of ETEX M radio station specification and pre-inspection.
- Helideck and ETEX M radio station final approval and homologation by the Brazilian Navy.
- Coordination and execution of:
- NR-10 Electrical Installation inspections and final dossier compilation.
- NR-11 Material Handling and Lifting Devices inspections and final dossier compilation.
- NR-12 Machinery and Equipment inspections and execution of corrective actions.
- NR-13 Piping, Pressure Vessels, and Boilers dossier compilation, design review, site inspections, and execution of corrective actions.
- NR-17 Ergonomics inspections and execution of corrective actions.
- NR-33 Confined Space inventory, inspections, and execution of corrective actions.
- NR-37 Workplace Safety inspections and execution of corrective actions.
- Brazilian Navy NORMAM inspections and execution of corrective actions.
- ANVISA inspections and execution of corrective actions.
- Operating Manuals translation from English to Brazilian Portuguese.
- Human Reliability Analysis (HRA) and Safety Critical Task Analysis (SCTA) based on the FSO systems' Operating Manuals and Safety Critical Procedures.
- Ignition Hazard Assessment (IHA) for existing mechanical equipment installed in classified areas as per ISO 80079 and Brazilian regulation NR-37.
- Writing regulatory and technically sound answers, verifying and validating objective evidence, and gathering supporting FSO Project and Pre-Operations documentation to submit for ANP approval of Conditions for First Oil imposed by the regulatory agency.