Scope
- Mobilization of regulatory engineers for site execution coordination and punch list item close-out.
- Development of Regulatory Execution Plan and checklists.
- Development of Regulatory RACI matrix, starter pack, and requirements for procurement.
- Safety Studies review.
- Engineering design review.
- Regulatory Watch for continuous monitoring of changes and modifications in applicable rules and regulations.
- Development of Helideck layout drawings and pre-inspections.
- Development of ETEX M radio station specification and pre-inspection.
- Helideck and ETEX M radio station final approval and homologation by the Brazilian Navy.
- Revision and translation of Metering documentation.
- Development of Regulatory Work Packs for Shipyard and Vendors.
- NR-10 Electrical Installation inspections and final dossier compilation.
- Piping Integrity inspections and P&ID mark-up.
- NR-13 Pressure Vessels dossier compilation, design review, and site inspections.
- NR-33 Confined Space surveys and development of confined space drawings.
- Operating Manuals translation from English to Brazilian Portuguese.
