Scope
- Mobilization of regulatory engineers for site execution coordination and punch list item close-out.
- Development of Regulatory Execution Plan and checklists.
- Development of Regulatory RACI matrix, starter pack, and requirements for procurement.
- Safety Studies review.
- Engineering design review.
- Regulatory Watch for continuous monitoring of changes and modifications in applicable rules and regulations.
- Technical surveys and proposed repair and life extension actions carried out on Fire & Gas System — Dampers and Voting Logic, Fire Water Pump, Deluge, Foam, and CO2 Systems, and UPS System Redundancy.
- Revision of Cause-and-Effect Matrix.
- Top-level Regulatory Condition Assessment for compliance with Brazilian regulations, proposing remedial actions and insights to estimate the shipyard's scope of work covering firefighting systems, LSA, electrical and mechanical installations, Ex, human factors, pressure vessels, living quarters, helideck, material handling, and environmental aspects.
- Helideck structural calculation, tie-in point structural calculations, development of layout drawings, and pre-inspections.
- Development of Helideck layout drawings and pre-inspections.
- Development of ETEX M radio station specification and pre-inspection.
- Helideck and ETEX M radio station final approval and homologation by the Brazilian Navy.
- Revision and translation of Metering documentation.
- Development of Regulatory Work Packs for Shipyard and Vendors.
- NR-10 Electrical Installation inspections and final dossier compilation.
- Piping Integrity inspections and P&ID mark-up.
- NR-13 Pressure Vessels dossier compilation, design review, and site inspections.
- NR-33 Confined Space surveys and development of confined space drawings.
- Operating Manuals translation from English to Brazilian Portuguese.